A shed is only as level and dry as the base under it, and the base is only as good as the gravel you order. Order too little and you finish the pad with whatever is left over. Order too much and you pay to move a ton of stone you never needed.
This guide answers one question: how much gravel do I need for a shed base? It covers how big the pad should be, how deep to make it, the formula, a size chart for sheds from 8 × 8 to 12 × 16, and what to ask for at the supply yard. To skip the arithmetic, use the Gravel Calculator.
Quick answer
Make the gravel pad 1 ft larger than the shed on every side and spread it 4 to 6 inches deep. Cubic yards = (pad area in sq ft × depth in inches) ÷ 324, plus 10% for compaction. Example: a 10 × 12 ft shed needs a 12 × 14 ft pad, which at 4 inches is 2.07 cubic yards, or about 2.3 cubic yards with the 10% allowance (roughly 3.2 tons of crushed stone).
Last reviewed November 2026. Always follow your shed manufacturer’s base instructions, because local rules and soil conditions can change what you need.
How big should a gravel base for a shed be?
Extend the pad about 1 foot (30 cm) past every wall of the shed. The overhang gives the edges support and helps carry roof runoff away from the walls. Both SitePrep and Eartheasy give this 12-inch rule of thumb.
In practice, add 2 ft to each dimension of the shed’s footprint. A 10 × 12 ft shed sits on a 12 × 14 ft pad, and an 8 × 10 ft shed on a 10 × 12 ft pad. Measure the outside edge of the floor frame, including any overhang or porch.
How deep should a shed gravel base be?
Most residential sheds sit on 4 to 6 inches of compacted stone. Four inches is a common minimum for a small, light shed on firm, well-drained ground. Go to 6 inches on soft or clay soil, in wet climates, on a sloped site, or under a heavy building such as a workshop. SitePrep works its shed examples at 6 inches. If your shed maker specifies a depth, use that number instead.
How do you calculate gravel for a shed base?
- Size the pad. Add 2 ft to the shed’s length and width, then multiply them for the pad area in square feet.
- Choose a depth in inches. Use 4 inches for firm ground and 6 inches for soft or wet ground.
- Convert to cubic yards. Multiply pad area by depth, then divide by 324.
- Add a compaction allowance of about 10%. Loose stone packs down once it is compacted, and our Gravel Calculator uses the same 10% default.
- Convert to tons if your supplier sells by weight. Multiply cubic yards by the stone’s density. Crushed stone is commonly about 1.4 tons per cubic yard, and crusher run is closer to 1.6.
- Round up. Order to the next half cubic yard or quarter ton your supplier offers.
Formula: Cubic yards = (pad area in sq ft × depth in inches) ÷ 324. The 324 comes from 27 cubic feet in a cubic yard multiplied by 12 inches in a foot. The same shortcut works for mulch, soil, and concrete, as in our mulch guide.
Working in metric? Add about 30 cm to each side of the shed, use 10 to 15 cm of stone, and multiply pad area in m² by depth in metres to get cubic metres. A 3 × 3.6 m shed needs a 3.6 × 4.2 m pad (15.1 m²), which at 10 cm is about 1.5 m³ before compaction. Ask your supplier for the weight per cubic metre of the stone you choose.
Shed base gravel chart: 4 and 6 inch depths
This chart assumes a pad 1 ft larger than the shed on every side. Figures are before the 10% compaction allowance, and tons use 1.4 tons per cubic yard.
| Shed size | Pad size | Pad area | 4 in deep | 6 in deep |
|---|---|---|---|---|
| 8 × 8 ft | 10 × 10 ft | 100 sq ft | 1.23 cu yd / 1.7 tons | 1.85 cu yd / 2.6 tons |
| 8 × 10 ft | 10 × 12 ft | 120 sq ft | 1.48 cu yd / 2.1 tons | 2.22 cu yd / 3.1 tons |
| 10 × 10 ft | 12 × 12 ft | 144 sq ft | 1.78 cu yd / 2.5 tons | 2.67 cu yd / 3.7 tons |
| 10 × 12 ft | 12 × 14 ft | 168 sq ft | 2.07 cu yd / 2.9 tons | 3.11 cu yd / 4.4 tons |
| 12 × 12 ft | 14 × 14 ft | 196 sq ft | 2.42 cu yd / 3.4 tons | 3.63 cu yd / 5.1 tons |
| 12 × 16 ft | 14 × 18 ft | 252 sq ft | 3.11 cu yd / 4.4 tons | 4.67 cu yd / 6.5 tons |
Add about 10% to every figure for compaction. If you are buying crusher run, which weighs closer to 1.6 tons per cubic yard, multiply the cubic yards in the chart by 1.6 instead of 1.4 to get tons.
Worked example: a 10 × 12 ft shed on a 4-inch base
| Step | Calculation | Result |
|---|---|---|
| Shed footprint | 10 × 12 | 120 sq ft |
| Pad with 1 ft border | 12 × 14 | 168 sq ft |
| Depth in feet | 4 ÷ 12 | 0.333 ft |
| Volume | 168 × 0.333 | 56 cu ft |
| Cubic yards | 56 ÷ 27 | 2.07 cu yd |
| With 10% compaction | 2.07 × 1.10 | 2.28 cu yd |
| Tons of crushed stone | 2.28 × 1.4 | 3.2 tons |
| Tons of crusher run | 2.28 × 1.6 | 3.65 tons |
| What to order | Round up | About 2.5 cu yd (roughly 3.5 tons of crushed stone) |
The shortcut gives the same first answer: 168 × 4 ÷ 324 = 2.07 cubic yards. Bagged gravel does not make sense here, because 56 cubic feet is 112 bags at 0.5 cu ft each, before any compaction allowance.
What kind of gravel is best for a shed base?
Use angular crushed stone, not rounded stone. Sharp edges lock together when compacted and form a firm, free-draining pad, while smooth pea gravel and river rock roll and shift under weight. Names vary by region, so ask for crusher run, road base, or 3/4-inch crushed stone and tell the supplier it is for a shed base. On soft or clay ground, a layer of non-woven geotextile fabric under the stone helps stop it sinking into the soil.
How do you build the base so it lasts?
- Mark out the pad with stakes and string, then strip the grass and topsoil.
- Level the pad and let the ground around it slope away so rain does not collect.
- Lay geotextile fabric if the soil is soft.
- Spread the stone in layers of about 2 to 3 inches and compact each layer with a plate compactor.
- Check the finished surface is level in both directions before the shed goes on.
Common shed base mistakes
- Making the pad exactly the size of the shed, with no border.
- Using round pea gravel or river rock as the base.
- Skipping compaction, then watching the pad settle unevenly.
- Leaving topsoil and grass under the stone.
- Ordering the exact calculated amount with no compaction allowance.
- Building the pad lower than the surrounding ground, so water collects around it.
Shed base gravel FAQ
A 10 by 12 ft shed needs a 12 by 14 ft pad. At 4 inches deep that is about 2.07 cubic yards, or 2.3 cubic yards with a 10 percent compaction allowance, which is roughly 3.2 tons of crushed stone. At 6 inches deep it is 3.11 cubic yards, or about 3.4 with the allowance.
Most residential sheds sit on 4 to 6 inches of compacted stone. Use 4 inches for a small, light shed on firm, well-drained ground and 6 inches for soft or clay soil, wet climates, sloped sites, or heavy buildings. Follow your shed manufacturer’s instructions if they give a depth.
Make the pad about 1 foot larger than the shed on every side, so add 2 feet to both the length and the width. The extra stone supports the edges and helps carry runoff away from the walls.
Crushed stone is commonly about 1.4 tons per cubic yard, pea gravel about 1.35, and crusher run closer to 1.6. The exact figure depends on the stone and how wet it is, so ask your supplier for their number.
On soft or clay soil, non-woven geotextile fabric under the stone helps keep it from sinking into the ground. It does not replace a deep enough, well-compacted base, so treat it as an extra layer of protection.
Calculate your shed base gravel
Enter the pad area and depth, pick your stone, and get cubic yards, tons, and the compaction allowance in seconds.
Open the Gravel Calculator →Related guides and tools
- Gravel Calculator
- Cubic Yards to Tons Calculator
- Square Footage Calculator
- Estimating Concrete Slabs: Subbase, Depth & Bag Counts (if you would rather pour a slab)
- How Much Mulch Do I Need? Depth, Cubic Yards & Bag Counts
- Landscaping & Ground Materials Calculators
- All home improvement guides
Sources and further reading
- SitePrep: How much gravel do I need for a shed foundation?
- Eartheasy: Gravel calculator and shed base guidance
- Hello Gravel: How much gravel do I need? (cubic yards to tons)
- Your shed manufacturer’s installation guide, which sets the required base size, depth, and material for that building
- Your local building authority, if a permit or foundation rules apply to outbuildings in your area